Tuesday, May 6, 2008
Mumbai Traffic Nightmare
When is this going to end Nobody Knows. Day by Day the Situation is going out of Hand and there seems no end to the Woes of Motorists. The works being carried out on Mumbai Roads are timeless, God Knows Whose Coffers are being filled in such a way. There is no Centralised agency who monitors the works of these so called agencies like MMRDA, BMC, MTNL, etc...
Also some years back Mumbai traffic was called as the most disciplined, but now the situation is reverse. The Basic problem lies in the fact that on most of the arterial roads there are no dividers, also the locations of "right turns"/"U" Turns is tremendous. Most of the clogging is due to this as there is no control over who will take a "U" turn and Right turn. For Instance take the road near Bhawans College Andheri Where a right turn has been provided near Vijaya Bank, why can't this be closed as there is already a signal a mere 100 feet away. Such Locations are many in Mumbai which could have been avoided , thereby resulting in smooth Traffic Flow.
posted by Dattaprasad Parab @ 1:44 AM   0 comments
Monday, February 5, 2007
Bollywood today
Bachchans are investing a whopping amount on Abhishek Bachchan starrier 'Drona'. They are taking keen interest in executing special effects in this superhero flick. Drona is their answer to 'Krrish'. The budget of Krrish was approximately Rs 45 crore and Drona will be close to Rs 60 crore. A source says, "Krrish has a tough contender in Drona. The first schedule of the film was shot in Prague. Needless to say there have been no limitations as far as the budget is concerned. In fact, one can easily say that the Bachchans are making the film. Director Goldie Behl and producer Shristi are family friends of the Bachchans, and they're working closely as a team."
posted by Dattaprasad Parab @ 3:03 AM   0 comments
Saturday, February 3, 2007
Quantity surveyor
A Quantity Surveyor (QS) is a professional person working within the construction industry. The role of the QS is, in general terms, to manage and control costs within construction projects and may involve the use of a range of management procedures and technical tools to achieve this goal.

The profession developed during the 19th century from the earlier "Measurer", a specialist tradesman (often a guild member), who prepared standardised schedules for a building project in which all of the construction materials, labour activities and the like were quantified and against which competing builders could submit priced tenders. Because the tenders were each based on the same schedule of information, they would be easily compared to find the most suitable candidate.

The professional institution with which most English-speaking Quantity Surveyors are affiliated is the UK based Royal Institution of Chartered Surveyors (RICS).
posted by Dattaprasad Parab @ 10:24 PM   0 comments
CONCRETE MIX DESIGN

Admixtures are sometimes used in concrete mixtures to improve certain qualities, such as workability, strength, durability, watertightness, and wear resistance. They may also be added to reduce segregation, reduce the heat of hydration, entrain air, and accelerate or retard setting and hardening. We should note that the same results can often be obtained by changing the mix proportions or by selecting other suitable materials without resorting to the use of admixtures (except air-entraining admixtures when necessary). Whenever possible, comparison should be made between these alternatives to determine which is more economical or convenient. Any admixture should be added according to current specifications and under the direction of the crew leader.

Agents Materials, such as hydrated lime and bentonite, are used to improve workability. These materials increase the fines in a concrete mix when an aggregate is tested deficient in fines (that is, lacks sufficient fine material). Air-Entraining Agents The deliberate adding of millions of minute disconnected air bubbles to cement paste, if evenly diffused, changes the basic concrete mix and increases durability, workability, and strength. The acceptable amount of entrained air in a concrete mix, by volume, is 3 to 7 percent. Air-entraining agents, used with types I, II, or III cement, are derivatives of natural wood resins, animal or vegetable fats, oils, alkali salts of sulfated organic compounds, and water-soluble soaps. Most air-entraining agents are in liquid form for use in the mixing water. Accelerator The only accepted accelerator for general concrete work is calcium chloride with not more than 2 percent by weight of the cement being used. This accelerator is added as a solution to the mix water and is used to speed up the strength gain. Although the final strength is not affected, the strength gain for the first 7 days is greatly affected. The strength gain for the first 7 days can be as high as 1,000 pounds per square inch (psi) over that of normal concrete mixes. Retarders o f The accepted use for retarders is to reduce the rate hydration. This permits the placement an


CEMENT STORAGE Portland cement is packed in cloth or paper sacks, each weighing 94 pounds. A 94-pound sack of cement amounts to about 1 cubic foot by loose volume. Cement will retain its quality indefinitely if it does not come in contact with moisture. If allowed to absorb appreciable moisture in storage, however, it sets more slowly and strength is reduced. Sacked cement should be stored in warehouses or sheds made as watertight and airtight as possible. All cracks in roofs and walls should be closed, and there should be no openings between walls and roof. The floor should be above ground to protect the cement against dampness. All doors and windows should be kept closed. Sacks should be stacked against each other to prevent circulation of air between them, but they should not be stacked against outside walls. If stacks are to stand undisturbed for long intervals, they should be covered with tarpaulins. When shed or warehouse storage cannot be provided, sacks that must be stored in the open should be stacked on raised platforms and covered with waterproof tarps. The tarps should extend beyond the edges of the platform to deflect water away from the platform and the cement. Cement sacks stacked in storage for long periods sometimes acquire a hardness called warehouse pack. This can usually be loosened by rolling the sack around. However, cement that has lumps or is not free flowing should not be used. CONCRETE MIX DESIGN LEARNING OBJECTIVE: Upon completing this section, you should be able to calculate concrete mix designs. Before proportioning a concrete mix, you need information concerning the job, such as size and shapes of structural members, required strength of the concrete, and exposure conditions. The end use of the concrete and conditions at time of placement are additional factors to consider. INGREDIENT PROPORTIONS The ingredient proportions for the concrete on a particular job are usually set forth in the speci- fications under “CONCRETE—General Require- merits.” See table 6-3 for examples of normal
posted by Dattaprasad Parab @ 10:11 PM   0 comments
About Me

Name: Dattaprasad Parab
Home:
About Me:
See my complete profile

Previous Post
Archives
Google Search
 

 
ads